EICR Check List

Electrical Certificate Check List

What you need to do before one of our electricians attend your property to do an electrical certificate:

  • The engineer must have full access to the board; any obstructions must be removed prior to the test.
  • Board location must be provided to the office prior to the test to ascertain whether the engineer needs ladders.
  • PAYG meters must have enough credit in order for the engineer to conduct the test.
  • Any damaged fixed fittings must be identified prior to the test; broken light switches, cracked sockets etc.
  • All sensitive equipment must be unplugged prior to the test.
  • It is imperative for the Fuse board to be marked up; all relevant circuits must be identified correctly in order for the engineer to carry out the inspection.
  • If at any point the engineer believes the installation to be in an unsafe condition the test will be stopped and recommendations will be made to the customer for improvements which may be needed.
Book Online!

or Call Our Sales Line:
020 3772 5959


EICR INSPECTION PRE INSPECTION CHECKLIST

Please download and print our checklist for convenience.

Download

accreditations

All of our property professionals are members of the relevant scheme.


Testimonials

What our clients say